21st District Project in Montreal
We are glad to announce the signing of the 3rd phase of the 21e arrondissement project in Montreal, with Prével. It will be the 3rd building that we build in this complex which include 6 buildings, phase 3 being scheduled for autumn 2017.
This phase incudes 2 basements and 11 floors, representing a total of more than 275 000 sq.foot of formwork area.
Thanks to Prével for putting their trust in us again!